Landing of Ghana Exhibition Hall! Full-Process Record of Hongli's Overseas Air Conditioning Project

Worried about complicated processes for overseas central air conditioning project landing?Logistics delays,unprofessional installation,and lack of after-sales support trouble many customers.Taking the Ghana Lingzhen International Accra City Exhibition Hall project as an example,Hunan Hongli shares the full process of cross-border projects from preliminary communication to after-sales support,providing reference for overseas customers.
Preliminary communication focuses on details.Before the project starts,Hongli's overseas team conducts multiple detailed video communications with customers to confirm key information such as the exhibition hall's usage needs(daily office+product display)and local regulations(air conditioning energy efficiency standards,environmental requirements).Combined with Accra's high-temperature and high-humidity climate characteristics,the Gree CCE series magnetic levitation variable frequency centrifugal chiller scheme is determined,balancing energy saving and stability,with cooling capacity adapting to the peak demand of the exhibition hall.
During the scheme design phase,optimize the equipment room layout and pipeline planning,simplify complex construction processes considering local construction conditions.At the same time,coordinate with manufacturers to complete unit customization,and install surge protectors and voltage monitoring modules according to Ghana's power grid characteristics to ensure the equipment adapts to the local power environment.
The logistics link is carefully planned.The units are shipped from Hongli's 20,000㎡warehouse in Hunan,using moisture-proof and collision-proof customized packaging,and sent to Accra Port,Ghana by container shipping.Hongli arranges special personnel to follow up the logistics progress,prepares customs clearance documents in advance(certificate of origin,commercial invoice,packing list,etc.),and coordinates with local customs clearance agencies to efficiently complete equipment transportation and customs clearance from the domestic warehouse to the Ghana exhibition hall.
The installation and commissioning team is localized,led by senior domestic technical personnel,combined with local professional personnel,who receive pre-job training to ensure unified construction standards.According to the exhibition hall's spatial layout,optimize the pipeline direction and adopt concealed installation to not affect the exhibition hall's appearance;efficiently complete installation and commissioning,with unit operating parameters up to standard,stable cooling effect,and noise controlled within a reasonable range.
Cross-border after-sales establishes a long-term mechanism,providing 1-year free warranty+5-year paid maintenance service,reserves common spare parts(such as filters,sensors,etc.)in Ghana,and commits to 24-hour response to after-sales needs.Hongli's technical personnel conduct remote inspections every quarter to understand the unit's operating status and timely detect and solve potential problems.
The landing of overseas air conditioning projects requires professional coordination,and Hongli's years of cross-border experience are trustworthy.To learn more about overseas cases or consult cross-border project cooperation,please call the consultation hotline:0734-8844329.